Cost allocation with limited information

Publikation: Working paperForskning

Standard

Cost allocation with limited information. / Hougaard, Jens Leth; Tind, Jørgen.

Department of Food and Resource Economics, University of Copenhagen, 2013.

Publikation: Working paperForskning

Harvard

Hougaard, JL & Tind, J 2013 'Cost allocation with limited information' Department of Food and Resource Economics, University of Copenhagen. <http://ideas.repec.org/p/foi/msapwp/01_2013.html>

APA

Hougaard, J. L., & Tind, J. (2013). Cost allocation with limited information. Department of Food and Resource Economics, University of Copenhagen. MSAP Working Paper Series Nr. 01/2013 http://ideas.repec.org/p/foi/msapwp/01_2013.html

Vancouver

Hougaard JL, Tind J. Cost allocation with limited information. Department of Food and Resource Economics, University of Copenhagen. 2013.

Author

Hougaard, Jens Leth ; Tind, Jørgen. / Cost allocation with limited information. Department of Food and Resource Economics, University of Copenhagen, 2013. (MSAP Working Paper Series; Nr. 01/2013).

Bibtex

@techreport{31bb7129a18442d093a4834fe94d7ede,
title = "Cost allocation with limited information",
abstract = "This article investigates progressive development of Aumann-Shapley cost allocation in a multilevel organizational or production structure. In particular, we study a linear parametric programming setup utilizing the Dantzig-Wolfe decomposition procedure. Typically cost allocation takes place after all activities have been performed, for example by finishing all outputs. Here the allocation is made progressively with suggestions for activities. I other words cost allocation is performed in parallel for example with a production planning process. This development does not require detailed information about some technical constraints in order to make the cost allocation.",
author = "Hougaard, {Jens Leth} and J{\o}rgen Tind",
year = "2013",
language = "English",
series = "MSAP Working Paper Series",
publisher = "Department of Food and Resource Economics, University of Copenhagen",
number = "01/2013",
type = "WorkingPaper",
institution = "Department of Food and Resource Economics, University of Copenhagen",

}

RIS

TY - UNPB

T1 - Cost allocation with limited information

AU - Hougaard, Jens Leth

AU - Tind, Jørgen

PY - 2013

Y1 - 2013

N2 - This article investigates progressive development of Aumann-Shapley cost allocation in a multilevel organizational or production structure. In particular, we study a linear parametric programming setup utilizing the Dantzig-Wolfe decomposition procedure. Typically cost allocation takes place after all activities have been performed, for example by finishing all outputs. Here the allocation is made progressively with suggestions for activities. I other words cost allocation is performed in parallel for example with a production planning process. This development does not require detailed information about some technical constraints in order to make the cost allocation.

AB - This article investigates progressive development of Aumann-Shapley cost allocation in a multilevel organizational or production structure. In particular, we study a linear parametric programming setup utilizing the Dantzig-Wolfe decomposition procedure. Typically cost allocation takes place after all activities have been performed, for example by finishing all outputs. Here the allocation is made progressively with suggestions for activities. I other words cost allocation is performed in parallel for example with a production planning process. This development does not require detailed information about some technical constraints in order to make the cost allocation.

M3 - Working paper

T3 - MSAP Working Paper Series

BT - Cost allocation with limited information

PB - Department of Food and Resource Economics, University of Copenhagen

ER -

ID: 105343690